
I-695 over Liberty Road Bridge Replacement
Project Scope
The project included reconfiguration of key ramp merge/diverge movements within the MD 26 at I-695 interchange and replacement of the bridge carrying I-695 over MD 26. The work involved construction of a new 200-foot bridge carrying I-695 to improve safety and maintainability and be adaptable with future improvements, I-695 and MD 26 resurfacing and re-striping, minor widening, three new retaining walls, and three SWM facilities. The I-695 bridge was constructed in three stages with a complex MOT plan to maintain lanes on portions of existing and proposed bridge while adjusting the I-695 grade by more than 2 feet.