Project Scope

This project, located in Frederick County, is for the construction of a portion of
MD 180 (Jefferson Pike) from west of Swallowtail Drive to I-70 Ramp Structure No. 10140 for a total distance 0.69 miles. The work consisted of the Construction of two lane Bridge over US 15. The Construction of ADA compliant sidewalk and ramps. Installation of storm drain pipes, inlets, manholes, ditches, Bio-swales, microbioretention, ponds. Full depth roadway construction, base widening, patching, grinding, resurfacing, overlay. Clearing and Grubbing. Erosion and Sediment Control. Earthwork along with Signing, pavement marking, lighting, signal, and interconnect. Maintenance of Traffic, and Landscaping.

Project Information

  • Project Date

    October 14, 2020

  • Project Contract Value

    $21.6 Million

  • Project Owner

    SHA District 7 Contract# FR6785171