Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6121
MD 124 South of Airpark Road to Rosewood Manor Lane D/B - Concrete General, Inc.

Project Scope

Design-Build project to construct a 6-lane widening of 1.6 miles of MD 124 to improve congestion, safety and pedestrian access along this commercial and residential corridor. The design reconfigured multiple existing and new traffic signalizations and worked around the power company’s already relocated poles.

Project Information

  • Project Contract Value

    $29M Design-Build project

  • Project Owner

    MDOT SHA