Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6121
MD 210 Livingston Road/Kerby Hill Road Interchange D/B - Concrete General, Inc.

Project Scope

The project consists of grade-separated interchange at the MD 210 intersection with Livingston Road/Kerby Hill Road to provide safety improvements and congestion relief for this area. The project includes realignment of Livingston and Kerby Hill Road, major utility relocation and coordination, bridge structures, retaining walls, new pavement and existing pavement rehab, stormwater management quality and quantity facilities, signing, lighting and extensive maintenance of traffic including detours.

For a video rendering of this MD 210 project, please click here: http://bit.ly/2VP4izY

Project Information

  • Project Contract Value

    $83M design-build project

  • Project Owner

    MDOT SHA Contract No. PG7005170