Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the presto-player domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6121
US 29 at Briggs Chaney Road Interchange - Concrete General, Inc.

Project Scope

Grade separation of Briggs Chaney Road. Construction of a new double span architectural concrete bridge, MSE slopes and retaining walls, reconstruction and overlay of US 29, including off-ramps. Project included multi-phased maintenance of traffic and phase construction of structures.

Project Information

  • Project Contract Value

    $31M Project

  • Project Owner

    MDOT SHA, Montgomery County, MD No. MO8685170

Awards/Commendations

  • American Society of Civil Engineers - Maryland Certificate Award - Outstanding civil engineering achievement major construction project - Transportation , 2008