Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6121
White Flint West Workaround - Concrete General, Inc.

Project Scope

Construct the site/roadwork portions of the ‘White Flint West’ project. This project provided for infrastructure and roadway improvements for a new parking structure adjacent to the Montgomery County Convention Center. The project included numerous utility relocations (PEPCO, Verizon, Comcast, Washington Gas, WSSC), new asphalt roadway, removal of existing underground storm water management facilities, installation of new closed storm drain system, storm water management bioswale facilities, concrete curb and gutter, concrete sidewalk, ADA compliant sidewalk ramps, signage, street lighting and landscaping.

Project Information

  • Project Contract Value

    $7.6M Project

  • Project Owner

    MCDOT Montgomery County, MD Project No. 501506