Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6121
I-95 Moravia Road to Fort McHenry Tunnel - Concrete General, Inc.

Project Scope

The project enhanced mobility and safety by re-configuring I-95 between the FMT toll plaza and the I-95 Express Toll Lanes to provide four continuous lanes in each direction, approximately 4 miles (half on structure), by adding a lane within the existing highway typical section. The reconfiguration of the corridor required modifications to existing at-grade shoulders and nine existing bridge decks and median barrier/parapet to accommodate the required shift in the grade break point in the shoulders and deck cross section.

Project Information

  • Project Contract Value

    $49.4 million Design-Bid-Build

  • Project Owner

    MDTA