Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6121
US Rte. 29 BRT CMAR - Concrete General, Inc.

Project Scope

This project provides for the implementation of a bus rapid transit (BRT) system along 14-miles of US Rte. 29.  The project includes new frequent all-day BRT service operating in existing travel lanes and shoulders, construction of eleven architecturally designed stations along the corridor, purchase and installation of off-board fare collection equipment, and improvements to landscapes, sidewalk, and bicycle facilities to facilitate station access.

Project Information

  • Project Contract Value

    $15.5M CMAR project

  • Project Owner

    MCDOT Project No. 0501318