Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6121
Superstructure Replacement and Substructure Rehabilitation for Bridge No. 21089 - Concrete General, Inc.

Superstructure Replacement and Substructure Rehabilitation for Bridge No. 21089

Project Scope

The project consisted of removal and replacement of the existing deck and steel superstructure for Bridge No. 21089 on I-70 Eastbound over Ramp A, Washington County, MD. Rehabilitation repairs for the existing abutments and piers, including fiber wrap strengthening, support of excavation at the abutments for phased construction, paving and resurfacing on the approach roadways to the bridge, placement of w beam traffic barriers, signing and pavement markings. The project was phased for construction in 3 stages to minimize inconvenience and impacts to the traveling public.

Project Information

  • Project Contract Value

    $4.2M Bid-Build

  • Project Owner

    MDOT SHA Contract No. WA2155180